The experience

We carry the experience from approved concept to the finished room. Technical design, suppliers, schedules, budgets and site realities are managed without losing the creative intention that made the work worth producing in the first place.

What we do

  • BTL production & POSM
  • Construction & fit-out
  • Procurement & logistics
  • Maintenance & aftercare

How we approach it

A single production structure coordinates detailing, procurement, fabrication, installation, rehearsals, staffing, safety and live delivery.

Designed to create

  • One accountable team
  • Creative intent protected
  • Reliable delivery on site

Define what is designed and what is built

BTL production brings the physical parts of a campaign together. The production brief should identify which drawings are approved, who supplies artwork and what installation or dismantling is included. If the visitor journey or stand layout is still undecided, resolve those design questions before treating the fabrication quotation as a final scope.

Explore branded-space and exhibition design

Protect the idea through production and handover

Production translates an approved direction into materials, drawings, schedules and site activity. The specification should explain what is being built, how it will be installed and what needs to remain usable after handover. Samples and technical reviews help resolve finish, durability and assembly questions before full fabrication. Procurement, transport, site access and maintenance requirements belong in the same plan so that responsibilities do not become unclear between suppliers.

What to include in your brief

  • Approved designs, measurements, drawings and material specifications
  • Quantities, finish samples and acceptance criteria
  • Procurement lead times, delivery access and installation sequence
  • Handover documents, storage, reuse and aftercare requirements

Questions before you begin

What should a production quotation make clear?

It should state quantities, materials, finishes, included services and assumptions. Check transport, installation, electrical work, storage, dismantling and aftercare separately. Compare proposals against the same specification rather than comparing only their totals.

Can production be planned for reuse?

Yes, when reuse is considered in the brief. Modular dimensions, replaceable graphics, durable connections and a storage plan can make components easier to use again. Transport, repair and adaptation costs still need to be assessed against the next use.